top of page

CPV Towantic

CPV Towantic  (Oxford CT)

   The CPV Towantic Energy Center is a 785 megawatt natural gas-fueled combined-cycle electric generating facility currently under construction in the Woodruff Hill Industrial Park in Oxford, Connecticut. The facility will generate enough electricity to power nearly 800,000 homes, helping Connecticut to safely meet its demand for energy with reliable, cost-effective and environmentally-responsible low emissions generation.

    Thomas P. Stewart Consulting performed multi trade welder quals (FCAW, GMAW, GTAW, SMAW) and all field weld inspections, of ESD’s, SDD’s, Condensate, Air Extraction & Vacuum systems per ASME Sect. IX & BPV B31.1. Conducted all bolting inspections per AISC and verifying 20% of torque on 30 Fan Cell Deck and Tower structures. Responsible for weld, travelers, mapping, certified documentation, all FME inspections, writing NCR’s and RFI’s for ACC installation issues. Coordinated all NDE inspections with 3rd party, verifying all systems received inspection requirements of Contract.

bottom of page